The Ministry of Agriculture, Forestry and Water Economy invites qualified individuals to submit Expressions of Interest for the position of Local Hydropower Engineer (full-time, 12 months) under the Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP).
The engineer will provide senior technical advice and engineering oversight for the preparation and early implementation of the Phase III hydropower investments, including review of feasibility studies and detailed designs, hydropower optimization, procurement support, SCADA and grid interconnection, permitting, testing, commissioning, and coordination with irrigation, drinking-water supply, reservoir operations and dam safety requirements.
Application deadline: 27 October 2026, 12:00 (Skopje local time).